Eco Wave Power Global AB (publ) reported wave energy production results for February 2026 from its EWP-EDF One pilot project at Jaffa Port, Israel. The system operated for about nine days under moderate conditions with average daily wave heights of 1 to 2 meters, generating approximately 2,000 kWh of electricity. The company also recorded its highest wave conditions at the site, with waves reaching around 3 meters; during these events, the system achieved an average power production of about 20 kWh and a peak production of 56.7 kW. Eco Wave Power said the Jaffa Port system has maintained zero downtime since the beginning of 2025, with stable operation in wave conditions of 1 meter and above.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Eco Wave Power Global AB (publ) published the original content used to generate this news brief via EDGAR, the Electronic Data Gathering, Analysis, and Retrieval system operated by the U.S. Securities and Exchange Commission (Ref. ID: 0001213900-26-023420), on March 04, 2026, and is solely responsible for the information contained therein.